Thursday, August 19, 2010

Today is 8.19.10 - Lots has happened!!

Howdy All... well you can see we have some roofing going on which is very exciting! Shingles currently line the garage side of the house but I don't have a super recent shot.. this was 2 days ago!

We've also added some drainage solutions in the front yard...

And have a completed front entrance! Love this... thanks Matt!
This is the view of the soffit under the entrance that you see above - this will have metal roofing.
And electrical is all roughed in... this is the half wall into the kitchen with switches on it.
Here is our HVAC system - no more allergies! (well, less!)
Some can lighting as well as more HVAC
The lighting in the kitchen peaked roof.
The entrance switch... it does a lot!
Electrical panel in garage.
How do they keep it straight with all those cords!?
The "tile" pattern has been cut into the concrete in first floor bathrooms.


And some drainage in the backyard... digging the french drain to dry well... fill with rock, cover... see below!
The dry well

All done!