Here is out hose outlet - very exciting stuff.
Driveway culvert
Thursday, August 19, 2010
Today is 8.19.10 - Lots has happened!!
Howdy All... well you can see we have some roofing going on which is very exciting! Shingles currently line the garage side of the house but I don't have a super recent shot.. this was 2 days ago!
We've also added some drainage solutions in the front yard...
And have a completed front entrance! Love this... thanks Matt!
This is the view of the soffit under the entrance that you see above - this will have metal roofing.
And electrical is all roughed in... this is the half wall into the kitchen with switches on it.
Here is our HVAC system - no more allergies! (well, less!)
Some can lighting as well as more HVAC
The lighting in the kitchen peaked roof.
The entrance switch... it does a lot!
Electrical panel in garage.
How do they keep it straight with all those cords!?
The "tile" pattern has been cut into the concrete in first floor bathrooms.
And some drainage in the backyard... digging the french drain to dry well... fill with rock, cover... see below!
The dry well
All done!
We've also added some drainage solutions in the front yard...
And have a completed front entrance! Love this... thanks Matt!
This is the view of the soffit under the entrance that you see above - this will have metal roofing.
And electrical is all roughed in... this is the half wall into the kitchen with switches on it.
Here is our HVAC system - no more allergies! (well, less!)
Some can lighting as well as more HVAC
The lighting in the kitchen peaked roof.
The entrance switch... it does a lot!
Electrical panel in garage.
How do they keep it straight with all those cords!?
The "tile" pattern has been cut into the concrete in first floor bathrooms.
And some drainage in the backyard... digging the french drain to dry well... fill with rock, cover... see below!
The dry well
All done!
Tuesday, August 10, 2010
Friday, August 6, 2010
Wednesday, August 4, 2010
Updates through August 2, 2010 (not in order, sorry)
Hey Everyone - Sorry for the delays! Lots has happened recently including completion of interior framing, soffet and fascia complete, addition of an electrical box, addition of exterior speakers for deck, beginning of the deck construction, survival of flash flooding in CB last weekend and more... enjoy!
Jesse & Nina
Here is Matt working on the deck posts
Jesse & Nina
Here is Matt working on the deck posts
Soffet about to go in, fascia done
View down the hallway downstairs -looking into guest bathroom
Deck post in... more on this to come this week...
Fascia complete...
Entry way and stair case
Master framed in (looking at Jesse's closet, entrance to bathroom on left)
Jesse in the shower!
Views of Soffet
Subscribe to: